PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing South-East(800x600).jpg Stripping the foundation wall forms at Elev. 7-Stair 4,5 Facing West(800x600).jpg Anchor bolts survey (800x600).jpg Anchor bolts survey Column B-2(800x600).jpg Raised Slip forms at Elev. 1,2,3 3rd Floor Facing South-East (800x600).jpg Waterproofing along foundation walls at c.l A Facing North (800x600).jpg Waterproofing along foundation walls at c.l A Facing South (800x600).jpg
Previous pageNext page Raised Slip forms at Elev. 1,2,3 3rd Floor Facing South-East (800x600)
Raised Slip forms at Elev. 1,2,3 3rd Floor Facing South-East (800x600)